Design |
|
|
On Graph-Based Knowledge Representation in Design |
|
|
1 | (10) |
|
|
|
|
Teaching Agents How to Solve Design Problems: A Mixed Initiative Learning Strategy |
|
|
11 | (14) |
|
|
|
|
Intelligent Agent for Designing Steel Skeleton Structures of Tall Buildings |
|
|
25 | (11) |
|
|
|
Integrating Conceptual Structural Design with Early Architecture |
|
|
36 | (12) |
|
|
|
|
Design of Multi Storey Steel Framed Structure Using an Integrated Product and Process Model |
|
|
48 | (10) |
|
|
|
|
Evolutionary Computation in Design |
|
|
58 | (18) |
|
|
Optimizing Highway Networks: A Genetic Algorithms and Swarm Intelligence Based Approach |
|
|
76 | (14) |
|
|
Corporate Memory in Action |
|
|
90 | (13) |
|
|
Costing and Scheduling |
|
|
Computing Probabilities of Costs Using Cases |
|
|
103 | (10) |
|
|
|
|
A Case-Based Reasoning Approach to Construction Cost Estimating |
|
|
113 | (11) |
|
|
|
POST: Product Oriented Scheduling Technique for Constructability Analysis |
|
|
124 | (12) |
|
|
|
Cost and Schedule Reduction of Nuclear Power Plant Construction Using 4D CAD and Immersive Display Technologies |
|
|
136 | (9) |
|
|
|
|
|
A Construction Simulation Model for Production Planning at the Pentagon Renovation Project |
|
|
145 | (9) |
|
|
|
Extended Production Integration for Construction (EPIC): A Distributed Computing Environment for Building Construction |
|
|
154 | (13) |
|
|
|
|
Construction Schedule Visualization |
|
|
167 | (12) |
|
|
Management |
|
|
Knowledge-Based Management of Economic Risks in Large Infrastructure Projects |
|
|
179 | (15) |
|
|
|
Implementing Automated Methods for Document Classification in Construction Management Information Systems |
|
|
194 | (17) |
|
|
|
Implementation Challenges and Research Needs of the Industry Foundation Classes (IFC) Interoperability Standard: Experiences from Helsinki University of Technology Auditorium Hall (HUT-600) Construction Pilot |
|
|
211 | (10) |
|
|
|
|
|
|
Integrating Versioning and Workflow for Change Management for Concurrent Engineering |
|
|
221 | (11) |
|
|
|
|
Material Management Practices for the Electrical Contractor |
|
|
232 | (12) |
|
|
|
Design of Construction Production Processes: Framework and Conceptual Model |
|
|
244 | (14) |
|
|
|
A Methodology to Reconfigure the Design-Construction Interface for Fast-Track Projects |
|
|
258 | (15) |
|
|
|
|
Ubiquitous Computing Environment for Project Management Services |
|
|
273 | (13) |
|
|
|
|
|
Simulation Model for Manufactured Housing Processes |
|
|
286 | (12) |
|
|
|
|
|
Application of Case Based Reasoning in Construction Safety Planning |
|
|
298 | (10) |
|
|
Modeling |
|
|
Data Modeling for the Virtual Coach |
|
|
308 | (10) |
|
|
|
Semantic Process Modeling for Applications Integration in Architecture, Engineering, and Construction (AEC) |
|
|
318 | (18) |
|
|
|
|
|
|
Course Grain Modeling of the Thermal Behavior of Residential Structures Using Neural Networks |
|
|
336 | (10) |
|
|
Information Technology and the Internet |
|
|
Virtual Teams: A Guide to Successful Implementation |
|
|
346 | (11) |
|
|
|
Dissemination of Preliminary Design Build Bid Packages Through an Interactive Web Site---An Industry Case Study |
|
|
357 | (10) |
|
|
|
Using Integrated IT Tools from Project Pursuit to Construction |
|
|
367 | (11) |
|
|
Visualization |
|
|
|
378 | (13) |
|
Information Technologies in Civil Engineering Education |
|
|
Teaching Structural Engineering Using a State-of-the-Art Computer Program |
|
|
391 | (9) |
|
|
|
Constructing the Civil Engineering Thesaurus (CET) Using ThesWB |
|
|
400 | |
|
|
Indexes |
|
|
|
413 | |
|
|
415 | |