Atnaujinkite slapukų nuostatas

Estimating Air Force Deployment Requirements for Lean Force Packages: A Methodology and Decision Support Tool Prototype [Minkštas viršelis]

  • Formatas: Paperback / softback, 78 pages
  • Išleidimo metai: 01-Feb-2018
  • Leidėjas: RAND
  • ISBN-10: 0833097547
  • ISBN-13: 9780833097545
Kitos knygos pagal šią temą:
  • Formatas: Paperback / softback, 78 pages
  • Išleidimo metai: 01-Feb-2018
  • Leidėjas: RAND
  • ISBN-10: 0833097547
  • ISBN-13: 9780833097545
Kitos knygos pagal šią temą:
This report describes a methodology and prototype tool—the Lean Strategic Tool for the Analysis of Required Transportation (Lean-START)—that can explore trade-offs among capability (or risk), speed, and cost to create force packages for deployment.
Preface iii
Figures
vi
Tables
vii
Summary viii
1 Introduction
1(5)
Overview of the Lean-START Model
4(1)
Organization of This Report
5(1)
2 The Planning Process and the Role of Lean-START
6(10)
Changing Dynamics of Force Planning
6(1)
The Joint Planning Process
6(2)
Air Force Planning to Support Joint Operations
8(2)
Elements of the Tradespace and Lean-START
10(3)
Articulating and Managing Risk in Deployment Planning
13(2)
Lean-START and Risk
15(1)
3 How the Model Works
16(18)
Data Sources and Rule Sets in Lean-START
16(8)
Operation of Lean-START
24(10)
4 Example Calculations
34(15)
Baseline Case: 24-Ship F-16 Deployment
34(7)
Distributed Basing
41(3)
Time-Phasing of Requirements
44(2)
Prepositioned Equipment Investment Cost
46(2)
Risk-Speed Matrix
48(1)
5 Conclusions
49(5)
Ways to Use Lean-START
49(1)
Limitations of the Model
50(1)
Observations from Initial Lean-START Analysis
50(1)
Implications for Lean Force Packages
50(1)
Implications for Operating in Contested, Degraded, and Operationally Limited Environments
51(1)
Recommendations and the Way Forward
52(2)
Appendix: Air Force Risks Management Policies 54(5)
Acknowledgments 59(1)
Abbreviations 60(2)
References 62